Client

NRG Energy

Location Pin

Shelocta, Pennsylvania

  • 70-foot-long single span seabet my
  • Pre-stressed box beams
  • 1,040 cubic yards of concrete
  • H-pile deep foundations
  • Three seabet my tracks
  • Design-builder contractor

Project Details

This project involved the construction of a 70-foot span railroad bridge for the Norfolk Southern main rail line into the seabet my Generating Station. The bridge incorporated precast adjacent box beams, and the work scope included rail scales to weigh gypsum discharged from the plant.