Furnace Foundation at Melt Shop
Client

Confidential Client

Location Pin

Pennsylvania

  • seabet slots games487 cubic yards of concrete
  • 128 anchor bolts
  • Work performed in active shop
  • Aggressive 2.5 month schedule

Project Details

An electric arc furnace seabet my(EAF) was added to the newly expanded melt shop. Mascaro’s scope of work included excavation, subgrades, installation of rebar and forms, and placement of concrete slabs, walls, and anchor bolts.