  • 1700 GPM acid mine water treatment facility
  • General contractor

Project Details

The scope of work included construction of an acid mine drainage (AMD) water treatment facility.  The pump building is comprised seabet myof block and plank with a concrete foundation and houses a lime silo, a truck unloading pad and sump, a pre-aeration basin, a ferrous reactor basin, a thickener, lime feed system, polymer feed system, sludge conditioning tank, sludge conditioning Seabetpumps, sludge recycle pumps, and sludge disposal pumps.