siteseabet login Foundation at Melt Shop
Client
Confidential Client
Pennsylvania
- 487 cubic yards of concrete
- 128 anchor bolts
- Work performed in active siteseabet login
- Aggressive 2.5 month schedule
Project Details
An electric arc siteseabet login (EAF) was added to the newly expanded melt shop. Mascaro’s scope of work included excavation, subgrades, installation of rebar and forms, and placement of concrete slabs, walls, and anchor bolts.