CMU Heinz College seabet casino games Hall
Client
Carnegie Mellon University
Pittsburgh, Pennsylvania
- Renovation / expansion
- 69,305 squre feet
- 24 months of seabet casino games
- LEED® Gold lecture seabet casino games addition
- seabet casino games manager at risk
Project Details
Phase 1 included the demolition and rebuilding on A-level of seabet casino games Hall to relocate multiple departments in preparation for the Heinz addition. A 3,600-square-foot, single-story addition and a 3,600-square-foot rooftop plaza were constructed between seabet casino games and Smith Halls in the existing exterior courtyard space during Phase 2. In Phase 2.5, the interiors were renovated on the second and third floors to house new classrooms, faculty and graduate student offices, and branded research centers.